term used for shrinkage, evaporation, and so on. The cost of waste from these causes usually is not traced and is not recognized in the accounts. In a standard cost system an allowance for waste may be included in the determination of standard cost. Waste in excess of standard is thus revealed as a quantity or usage variance.