largest volume of output possible if a facility maintained continuous operation at optimum efficiency, allowing for no losses of any kind, even those deemed normal or unavoidable; also called maximum capacity, theoretical capacity, or engineered capacity. Since it is impossible to obtain ideal capacity, unfavorable variances will result if it is used to apply fixed cost.