1. any difference between a budgeted figure and an actual figure.
2. any difference between actual factory overhead costs and standard (flexible budget) costs, multiplied by the standard units of activity allowed for actual production. The budget variance is used in the TWO-WAY ANALYSIS of factory overhead. It includes the fixed and variable spending variances and the variable overhead efficiency variance that are used in the THREE-WAY ANALYSIS.